Citation: ALL ER (D) 288, (2007) 111 Con LR 48
Nature of case: Following the trial of the first ten preliminary issues, the court had held in June 2006 that Cleveland Bridge had repudiated the steel sub-contract at Wembley Stadium. This part of the litigation decided that temporary roof works designed to support the roof during construction did not form part of the works covered by the fixed lump sum agreed.
Also reported in: [2007] Con LJ Vol. 23 No. 4 p. 299 TCC