0

Download your shortlist

Download All

WES Futures Ltd v Allen Wilson Construction Ltd

10 November 2016

Citation: [2016] EWHC 2863 (TCC); 170 Con L.R. 121; [2016] 6 Costs L.R. 1083

A claim to recover the costs of adjudication proceedings which were said to be recoverable by the terms of a Part 36 Offer which had been made before the adjudication but accepted after the adjudication.

Counsel

Jonathan Selby KC
Jonathan Selby KC